Windrose
Sign in Get the app

Your weather, laid out your way.

Start from a ready-made board, then move, resize and restyle every card. Put it on an old tablet by the door and it stays on, full screen, all day.

GET IT ONGoogle Play Or use it in your browser

Free for one station. No card needed.

A WindRose dashboard on a tablet in landscape: wind compass, temperature dial, humidity, barometer, comfort indices, sun path, rain totals and a seven-day forecast

Start from a board made for your day.

Seven starting layouts: Professional, Weather, Agriculture, Industrial, Solar, Marine, or a blank canvas. Each one arranges the cards that matter for that kind of day, and nothing stops you changing all of it.

  • Drag a card to move it, pull a corner to resize it
  • Add and remove cards from the catalogue
  • Changes stay a draft until you save them
The Agriculture board on a tablet: temperature, humidity, rain, solar radiation, gusts, infection-risk matrix, leaf wetness, heat stress and forecast

More than thirty cards to choose from.

Every reading your station sends has a card, and so do the things WindRose works out from them.

Readings

Temperature, humidity, pressure, wind, gusts, rain, UV and solar, as dials, numbers or bars.

Sky and forecast

Sun path, the next hours, a seven-day forecast, the live sky and an animated rain radar.

Air

Air quality with the 1-hour and NowCast indices, particulates, indoor CO₂ and noise.

Field and work

Leaf wetness, heat stress (WBGT), comfort indices and the pollutant dispersion map.

The station

Battery, signal, uptime and sensor health, so you know before a reading goes missing.

Your own

Pictures, notices for whoever reads the board, and monitors of your recordings.

Each card has its own settings.

Show or hide a title, set the alignment, choose the size. Cards with more to say have more settings: how the dispersion map draws the plume, its palette, basemap and reach; which air-quality index a gauge shows; which readings sit on the live sky.

  • A separate layout for the phone, from the same cards
  • Every change is per station and per person
The industrial board in edit mode on a computer, with the widget catalogue open in the side panel
The settings of the dispersion map card: plume style, palette, basemap, puff trail and maximum range

A background that fits the room.

Photographs in three moods (nature, weather, abstract), a live sky drawn from the current conditions, or a picture of your own garden. Dim it, blur it and set how much the cards let it through.

  • Photo presets on every plan
  • Your own photos and the live sky on every plan
A weather board on a tablet over a misty sunrise photograph

Turn an old tablet into a weather display.

Full-screen mode hides everything but the board and keeps the screen awake where the browser allows it. Choose whether the assistant and the navigation stay available, lock it with a PIN, and let it find its way back to the board after someone has looked around.

  • Keeps the screen on (Chrome and Android)
  • Returns to the board after a set idle time
  • PIN lock against curious hands
A weather board in full-screen mode on a tablet, with a cloudy-sky photo behind the cards

Try it on your own station.

Free for one station, no card needed. Upgrade only if you want more.